Andersen A2

Before the installation

The installation of the A2 must be done in a clear and secure environment.

  • Supply based on the table below:
Power Supply Cable
7kw 1 x 6mm 3 core armoured cable.
22kw 1 x 6mm 5 core armoured cable.
  • Twin & Earth can be used in some indoor settings but to be confirmed by your chosen installer
  • Data cable recommended for adaptive fuse and solar integration is Cat5e/Cat6 up to maximum of 30m

Trenching

  • We recommend trenching for a cable run is a minimum of 350mm deep